The bench sales playbook · 2 of 12

Reading a requirement post

5 min read · Updated 23 October 2026

A requirement post is short, but every line changes who you can submit. Read it in this order before you think about a consultant.

1. Role and must-have skills

The title ("Sr. Java Developer") and the skills list. Separate the must-haves (often written as "must have", "mandatory", or listed first) from the nice-to-haves. Years of experience are usually firm.

2. Location and work mode

3. Duration and type

"6+ months", "12 months, extendable", "contract to hire" (the client may hire the consultant full time later). Longer projects are worth more effort.

4. Rate and tax terms

"$65/hr C2C" is what the vendor will pay your company per hour. "DOE" means "depends on experience": ask.

5. Visa lines

The post says which work authorisations the client accepts. Common ones:

Immigration rules change. Check your company's own immigration process before you promise anything about a consultant's status.

6. Client, job ID and the recruiter

A named client and a job ID make a requirement real and let you check for repeat submissions. The recruiter's email and phone at the bottom are your contact; save them.

In BenchPilot: the drawer reads these lines for you (role, location, C2C, visa, rate, client) and shows them as chips on the card.

BenchPilot does the routine for you. It reads the requirements you scroll past, matches them to your bench and checks your submission history.

Add to Chrome, free